Cement-based penetrating crystalline waterproofing material

As a privately-owned enterprise, Sheng Xinyuan Building Materials is like a grain of sand in the vast ocean of the market economy. It has tenaciously rooted itself in the field of building admixtures, attracting talent from all walks of life: specializing in technology research and development and services, focusing on creating better and more applicable products, and acting as a unique "one-stop concrete solution" provider in the building admixture industry. "Being an expert in the admixture industry and a consultant in the concrete industry" is the code of conduct for Sheng Xinyuan people. Ten years of honing a sword. Now, the sharp edge appears.

Keyword:

Sheng Xinyuan Building Materials丨Water Reducer Series丨Crack Resistance and Waterproof Series丨Early Strength and Antifreeze Series丨Functional Series

Product Inquiry:

Product Description

 

Product Introduction Please first confirm that the product you are viewing is the one you need and meets your procurement standards You can click on the Online Consultation button on the page, and the customer service will help you find the required product based on your description.

Construction Instructions Please carefully read the construction instructions and pay attention to the construction key points

After-sales Service Perfect after-sales service support, if you have any questions about the usage, you can call 024-25866179

Engineering Cases The choice of many customers is because we insist on the product “ Zero Defects ”factory.

 
Product Introduction
 
  Cement-based penetrating crystalline waterproof material implementation standards: GB18445-2012, DB21/T1725-2009. Its main components are silicate cement, selected quartz sand, special active chemicals, etc., which is a gray powder material. The waterproof mechanism is to use water as a carrier, guided by water, with strong permeability, it transmits and fills in the micropores and capillaries of concrete, undergoes physicochemical reactions, and forms insoluble crystalline dendrites. The crystals combine with the concrete structure to form an integral closed waterproof layer, blocking the erosion of water and other liquids from any direction. It achieves permanent waterproofing and chemical corrosion resistance, while protecting the steel bars and enhancing the strength of the concrete structure.
 
Scope of Application
  Subway, basement, concrete pipes, reservoirs, power plants, cooling towers, dams, reinforced concrete ships, tunnels, dry docks caissons, rooftop squares, parking platforms, elevator pits, sewage treatment plants, swimming pools, nuclear power plants, food storage warehouses, sewage pools, bridge structures, aquariums, granaries, highways, airports, aprons, oil pools, sports fields, concrete pavements, bathrooms, etc.
 
 
Construction Instructions
 
(1) Scraping, brushing and spraying
①About 24 hours after the completion of the concrete structure construction, the base layer can be slightly moistened. If the construction of the concrete structure takes a long time or it is an existing concrete structure, the base layer should be continuously moistened until it is saturated and there is no free water.
②Brushing or spraying: On the properly prepared concrete surface, brush or spray according to the mass ratio. Usage ratio: powder: water = 3~4:1, dosage: 1.0-1.5kg/㎡.
③The amount of mixing should not be too much, mix as needed. The prepared slurry and semi-dry materials should be used up within the effective time from the time of adding water.
④When mixing, pay attention to even mixing, and there should be no unmixed dry material balls in the slurry.
(2) Spreading dry powder
①Penetrating crystalline powder is evenly spread through a 30-mesh or 40-mesh sieve once to the specified unit mass.
②Dry spreading construction before pouring concrete should be carried out 2 hours before pouring concrete, and after dry spreading on the wet cushion, it should be sprayed to permeate immediately; or concrete should be poured within 30 minutes after completing dry spreading of penetrating crystalline powder.
③When pouring and spreading at the same time, it is required to prepare the materials in advance, pour concrete and quantitatively sieve and spread dry powder, and spread evenly.
④When dry spreading after pouring concrete, it should be completed before the initial setting of the poured concrete. Immediately after spreading the penetrating crystalline powder, slurry should be pressed and compacted, and the next process can be carried out after final setting.
(3) Coating curing should comply with the following regulations:
①The coating should be alternately cured wet and dry in time, and the curing time should not be less than 72h. Water accumulation and soaking should be avoided during curing.
②When the construction site ventilation is poor, measures such as blowing and exhaust should be adopted.
③Before the coating is finally set, do not step on it, strictly prohibit smashing, scratching with hard objects, and other operations that may harm the coating. If the coating is accidentally damaged, it should be repaired in time to reach the initial coating state.
④Prevent rain, exposure, sewage, frost or low temperature below 4℃ within 48 hours after coating.
⑤The dry spread penetrating crystalline powder should not be blown away by the wind to prevent uneven thickness of the coating.
⑥After dry spreading of penetrating crystalline powder, water immersion should be avoided.
⑦After the completion of the waterproof project, drilling holes on the coating is strictly prohibited.
⑧When backfilling is required 48h after coating curing and before 72h, moist soft soil should be backfilled.
⑨The concrete structure of swimming pools and water storage pools must be cured for 3 days before being placed for 7 days before use: for concrete structures with corrosive liquids, they need to be placed for 18 days before filling.
 
 
Product Packaging and Storage
 
Packaging: 20kg barrel or 25kg bag
Transportation: It can be transported by car or train. During transportation, pay attention to preventing damage and moisture
Storage: The materials should be stored in a dry place, avoiding exposure to the sun and rain
Shelf life: The shelf life of the product is 12 months
 
 

All products purchased by customers are delivered directly to the construction site

 

After-sales Service

For products purchased by customers, our company will assign a special person to track the service throughout the process. The company's technical engineers will answer customers' questions during use in real time. For key customers, our company will... Dispatch a technical engineer to provide on-site technical guidance.

 